1. Lake St. Construction Begins

    IDOT has begun work to patch and resurface Lake Street between Summerfield Drive and I-355. The work will be completed in two phases with Phase 1 in 2019 and Phase 2 in 2020. Motorists are encouraged to use Army Trail as an alternate route. Read on...
  2. Rain Barrels For Sale

    The Village of Bloomingdale has partnered with The DuPage Conservation Foundation to offer rain barrels to Village of Bloomingdale residents through a partnership with Upcycle Products, Inc. The rain barrels are offered for sale for $60 (plus tax). Read on...
  3. Report Airplane Noise Disruptions

    The Village of Bloomingdale advocates for its residents regarding the increased plane noise over Bloomingdale by being an active member of the O’Hare Noise Compatibility Commission (ONCC). To assist, we encourage residents to register and file a report. Read on...
View All

June 2019

Sun Mon Tue Wed Thu Fri Sat
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6
View All